CASE 6

If given the opportunity to be the Project Manager of the programs, what quick solutions to these problems can be introduced?

The technology nowadays has greatly affected our everyday lives. From the house until going to work or school we have been constantly using the technologies developed and was innovated in time. This said technologies have helped us work efficiently but these said technologies have also negative effect. Anyway, speaking of technologies there have been a lot of these that has been quite used by people to help in their individual work. One of these is the computers, computers that can be used to show and provide input and output. Since computers has this capability it will help the institutions to work proficiently, and one of this institutions is the schools. Proposing an online registration for the students so that the students could enroll through the internet without experiencing the hassle of travelling to the campus, the system incorporated the business rules in the academic world-subject pre-requisites, student’s payment status, and other vital information about a student’s registration in the university. This will help lessen the hard enrollment process which has been happening for many years. This would also mean less paper work since everything will undergo virtually. The idea itself is ideal for today’s generation which is computer reliance. But, the fact that there will always be complication will never change.
There are several problems that have risen within the registration for the coming 2nd-5thyear students for the second semester of School Year 2011-12, this were the problems that have been cited:
a. Non-enrolment of students due to late uploading of students’ grades by the teachers caused by several factors including computer literacy of senior teachers;
b. Slow updates of course and grade uploads due to slow connection and server traffic caused by the number of teachers and students using the program all at the same time, and;
c. For some reasons, the system’s database was hacked which resulted to mismatch of students’ grades and students’ identification.
Assuming the position of the Project Manager and provide a quick solution to the cited complications. These are probable solution that I recommend to the problems introduced:
The non-enrollment of the student due to the late uploading of the grades is really a big problem. Having this problem would really delay the progress of the enrollment since the grades aren’t been settled down. Since the student’s grades have a big impact to the enrollment process facing this problem in the midst of the enrollment process will give a lot of headache not only to the teachers and students but also to the school itself. This will affect the whole enrollment process because the student’s grade is essential to the enrollment process and it also involves the student’s from 2nd-5th year level.
To provide a quick solution to this said problem I have two solutions that can be of help to the said problem:
First is I would like to recommend that there should be proper introduction, orientation and education for the said program. Proper introduction and education should be given to every teacher as to how the program should work so that any changes in connection to the student’s grades can be immediately done or the encoding of the grades will be finished on schedule. Since the teachers are already given the proper orientation for the program then their work will be done sooner. Having the student’s grades sooner will help the enrollment process to proceed smoothly. Considering that every teacher has their own personal computers, laptop or etc. then this solution is quite useful.
Second is that considering the factor that not all of the teachers have their own device to use I recommend that there will be a separate group which will focus on the program. Having a separate group, the teachers will only be submitting the student’s grades and the separate group will do their work. By setting up a deadline as to when will the grades be submitted then the separate group can start working and finish on schedule. Then the team will work on the encoding of the grades setting their own goal, when they will finish the encoding of the entire levels. This will definitely lessen the problem of the late upload in the student’s grade thinking that there will be a specific group that will work on the encoding.
The slow connection and the server traffic can really cause a huge problem especially to the teachers and the students. This will affect the set schedule, keeping in mind that the student’s grades are essential to the enrollment process. Having in mind that not only the teachers are using the program but also the students which has their own problems which is the cause for them to gradually monitor or use the program thus resulting to the said server traffic. This will be a big complication that would cause the server to be slow or eventually causing server down.
I recommend, having upgrade server connection which will resolve the slow connection. Having this upgrade will also make updates of course and grade uploads to be faster which will be helpful for accommodating a large number of users. In accommodating a greater number of users this upgrade will be of help which will also make any proceedings to be done on schedule. Thinking that the following proceedings will be done on schedule can resolve the previous problem. It is also nice to have an administrator to work on the program so that the program will be monitored timely and any problems concerning the program would be easily fixed because of the continuous monitoring of the administrator. The administrator will also be the one to work on the possible solution which can possibly rise anytime. Having the administrator to monitor the program will be useful thus further complication won’t be avoided since there are many users of the program. Though, considering that there will only be a specific group to work on the grade uploads would also help lessen the server traffic or congestion. Since, there will only be a limited group working on the student’s grade uploading then it would also lessen the number of users thinking that the teachers won’t be using the program too much.
Despite everything businesses change, and change is happening at a faster rate than ever before. So it is not realistic to expect no change in requirements while a system is being built. However uncontrolled changes play mess with a system under development and have caused many project failures. This emphasizes the advantages of shorter timescales and a phased approach to building systems, so that change has less chance to affect development. Nonetheless change must be managed like any other factor of business. The business must evaluate the effects of any changed requirements on the timescale, cost and risk of project. Change management and its sister discipline of configuration management are skills that can be taught.

The developers will do a great deal of testing during development, but eventually the users must run acceptance tests to see if the system meets the business requirements. However acceptance testing often fails to catch many faults before a system goes live because: poor requirements which cannot be tested, poorly planned tests meaning that the system is not methodically checked, inadequately trained users who do not know what the purpose of testing is and lastly inadequate time to perform tests as the project is late.

The scope is the overall view of what a system will deliver. Scope creep is the insidious growth in the scale of a system during the life of a project. As an example for a system which will hold customer records, it is then decided it will also deal with customer bills, then these bills will be provided on the internet, and so on and so forth. All the functionality will have to be delivered at one time, therefore affecting time scales, and all will have to have detailed requirements. This is a management issue closely related to change control. Management must be realistic about what is it they want and when, and stick to it.

Underestimation and analysis failures – Projects can be complex undertakings. However that complexity is often not immediately apparent when a project first begins. Instead, the team needs to carefully analyze the project and discover the complexities involved. Those complexities need to be understood before commitments to schedule and budget are confirmed. If commitments are given before the full complexity has been appreciated a project can easily end up making unrealistic commitments that ultimately create a pressurized environment in which the project can only fail. 

Risk failures – Predicting the future is a risky activity and because projects are all about creating the future, projects inherently involve risk. Where a project is blind to those risks they are likely to run into serious difficulties that they failed to anticipate. Those difficulties are sometimes serious enough to derail not just the project, but even the organization as a whole.

Risk exposure is a combination of the probability that a specific risk could materialize into a problem and the negative consequences for the project if it does. To manage each risk, select mitigation actions to reduce either the probability or the impact. You might also identify contingency plans that will kick in if your risk control activities are not effective. 

The systems database being hacked and resulted to the student’s grades and identification getting mismatched is really a troublesome thing. Judging from the said problem there is a great possibility of the grades to be reviewed from the start since there have been a mismatch not only the grades but also the student’s identification. However if the problem was disastrous enough then everything within the database will be repeated or they will have to start from scratch. This problem would have a big effect in everything since the database itself was the one affected by the hacking. The said problem is hard to prevent thinking that there is really a big possibility of it happening though not sooner than what is expected. There should always be a countermeasure to this problem.
Considering my recommendation to the previous problem there should be an administrator to keep monitor for the program. Having continuous monitor of the program will help lessen the possibility of the systems database to be hacked. Since the administrator has gained control over the program then any complications can be easily identified and will be resolve. Also, there should be a much stronger security provided for the protection of the students’ grades and students’ identification. This will also help avoid the problem wherein the student’s grades and identification will get mismatched. Thinking about the fact that the program was hacked then the previous security wasn’t proven to be strong, though the fact that there will always be a hole in every system then the security of the database should always be monitored and controlled. Also, the security of the system’s database should be constantly monitored and eventually changed keeping in mind that in our generation everything can easily searched through internet. There should also be a back-up file so that this problem can be quite resolved since there was a prepared file. Having a back-up file will help because the previous database will only be changed or replaced by the saved file. This will also lessen the work of the administrators given that they were able to prepare for the said problem.
Computer literacy should be observed considering the fact that there are others that aren’t capable of using the current technologies. Even though at this age we are being dependent on the said technologies but there will still be others which are not able to adapt to the said technology. So, proper education about the program should come first to help the future users of the program the idea what to do and what is the program capable of doing. Keeping that in mind will also lessen the problem of others getting caught up in the previously said problem. There should be proper orientation to everyone which will be using the program. This would help the users to be able to fully understand how the program works and how to properly use it. Having taught the users how to use the program would help them know which options to choose and buttons to click. It will also give them the idea where to go if they are looking for specific information about someone, something or themselves. The idea of educating the users first shouldn’t be neglected since the program itself is user dependent.
The main driver is the popularity of social networking, file sharing and video streaming sites. These changes in and growth of Web traffic are expected to continue, not only as the Web becomes a de facto front-end for many emerging cloud-based services, but also as many existing applications, such as game and video, are consolidated to the Web.



Second, the need for Web access also has grown, exposing the poor Web access problem for many users in bandwidth-limited environments. For example, the thousands of students that accessing the universities websites in one time and the teachers that uploading the grades and the administrator that uploaded the schedules for the semester, the problem remains for people who access the Web via cellular or wireless networks. As the deployment of mobile devices becomes increasingly widespread, the problem of poor Web access will be exacerbated. 

In order to improve Web access, we must first understand the underlying characteristics of Web traffic. Web traffic results from interactions among many components including clients, proxies, and servers, so only a detailed understanding of these interactions can offer insight for improving Web access. For example, analyzing end-user browsing behavior can lead to a Web traffic model, which in turn can be used to generate a synthetic workload for benchmarking or simulation. Also, investigating the Web page loading process reveals where the bottleneck lies in the user-perceived page loading latency. Furthermore, analyzing the redundancy of Web traffic and effectiveness of caching could shape the design of caching mechanisms. And so we increased the bandwidth of the server to manage the web traffic for the teachers and the students.

Slow connection will definitely be proven to be a problem. Having slow connection would affect the process which will be undergone by the users. This will be a problem to the users because having a slow connection might cause impatience to them. Since, users would definitely want to get done as soon as possible so they wouldn’t want to be caught up in traffic. But, having slow connection is also the same as being caught up in server traffic so having slow connection should be provided with an immediate remedy. There should be an upgrade to the connection to provide a fast working program which will be able to catch up to the need or wants of the users.
Server traffic is also one of the considered common problems to the program. Having a lot of users would definitely result to congestion. Therefore there should be a server upgrade to be able to utilize the program which will optimize the program capabilities. In doing so, there can be an increase in productivity and performance of the program, allowing a large number of users to use the program without delay and slow response times or failed connections. An upgrade will result to the program being continuously available for users and there would be guaranteed around the clock access.
Hacking was also considered to be a big problem since it has affected the system’s database. Since, the database is very important considering it holds a great number of information it should be well protected and secured. The fact that it is the main source and container of the student’s grades and identification there should be a much greater security placed unto it to avoid problems. The system or the program should always be monitored and controlled to be able to avoid hacking. The information in the database should have a back-up since the files within it are essential and are important.
Further information by the students is also permitted as they give great constructive criticism to the system. They are the first ones to use the system of course which makes them our great customers. There is someone who said that “The customers are always right” is always correct. We must understand the customer’s agony by fixing the codes that are in the system. Changing the system to a better one will surely give them happiness as what project managers must do. A lot of functions in the system must be implemented if this must be finished. The system must take full advantage of the current technology around us taking all the latest techniques in the internet, what they use and how to combat a threat if there is one. In this way we can safeguard the system with the necessary technology to ward of the hackers and make the system as faster as possible. There should be a full understanding of the system of course. A full understanding will make the job easier and less messy as programmers would be in confusion if this would happen. Also, further study is needed for this project. If there are more defects that stayed in the project and has not been seen or resolved then it would be wise to record it in a note or paper that will inform the future project manager on what to do or what they could succeed in times that we were not. After releasing the system to the public, there should be a testing phase so that the team can handle the old and new bugs that have been seen by the team that’s why there is a beta testing stage that will invite some of the students of the University to examine and create some opinions of the project that will make the team be aware of the problem or be proud of themselves for the compliment that the students give them.
Project manager are the ones that direct, co-ordinate and monitor the project with respect to all professional, technical, administrative, accounting, procurement and supervisory services and activities for the duration of the project. And the project manager provide the services necessary to assume responsibility for the phases of the project that includes preparation and agreement of performance objectives for the project, the achievement of the objectives and the supervision of the work to the extent necessary to achieve the objectives. A project manager should always remember that there are many things that should be considered before making any decisions. Just like in this scenario given, this is a problem which involves many factors: like people, time, cost and many more. These factors should be agreed or approved by the project manager and all of the other people who are involved in this matter so that everything will be fine when decisions are to be made.

I conclude that the system is absolutely useful to the university and also to the student’s which is a hassle free enrollment. This system would definitely be of help and it is effective. It would be a useful system which can make things done without any hassle to everyone through a good understanding of the program. The idea is great since it will make the enrollment process to proceed smoothly. Though, there will always be a fact that problems and complications might arise then it should be thoroughly studied before implemented. There should be a system assessment to see if it has produced good result until then the system should still be examined. By studying the system this would avoid complications, complications such as computer literacy, slow connection, server traffic and hacking. This kind of system would take a lot of studying because it has a large scale of users that will eventually depend on it. It should be well-planned to lessen the complications which have been cited. Great planning would really be essential to the succession of the program and also to the future usage of the program. 

Post a Comment



+
project management

Shay here!...
Well I'm... 20. Senior?. University of Southeastern Philippines. BS in Information Technology.
I ♥ Sweets!. Marshmallows. Cakes. Ice Creams. Donuts. Chocolates.

When I'm Bored? I... Read. Eat. Sleep. Surf the Internet. Watch Movies.
Play Online Games.
«