CASE 6

If given the opportunity to be the Project Manager of the programs, what quick solutions to these problems can be introduced?

The technology nowadays has greatly affected our everyday lives. From the house until going to work or school we have been constantly using the technologies developed and was innovated in time. This said technologies have helped us work efficiently but these said technologies have also negative effect. Anyway, speaking of technologies there have been a lot of these that has been quite used by people to help in their individual work. One of these is the computers, computers that can be used to show and provide input and output. Since computers has this capability it will help the institutions to work proficiently, and one of this institutions is the schools. Proposing an online registration for the students so that the students could enroll through the internet without experiencing the hassle of travelling to the campus, the system incorporated the business rules in the academic world-subject pre-requisites, student’s payment status, and other vital information about a student’s registration in the university. This will help lessen the hard enrollment process which has been happening for many years. This would also mean less paper work since everything will undergo virtually. The idea itself is ideal for today’s generation which is computer reliance. But, the fact that there will always be complication will never change.
There are several problems that have risen within the registration for the coming 2nd-5thyear students for the second semester of School Year 2011-12, this were the problems that have been cited:
a. Non-enrolment of students due to late uploading of students’ grades by the teachers caused by several factors including computer literacy of senior teachers;
b. Slow updates of course and grade uploads due to slow connection and server traffic caused by the number of teachers and students using the program all at the same time, and;
c. For some reasons, the system’s database was hacked which resulted to mismatch of students’ grades and students’ identification.
Assuming the position of the Project Manager and provide a quick solution to the cited complications. These are probable solution that I recommend to the problems introduced:
The non-enrollment of the student due to the late uploading of the grades is really a big problem. Having this problem would really delay the progress of the enrollment since the grades aren’t been settled down. Since the student’s grades have a big impact to the enrollment process facing this problem in the midst of the enrollment process will give a lot of headache not only to the teachers and students but also to the school itself. This will affect the whole enrollment process because the student’s grade is essential to the enrollment process and it also involves the student’s from 2nd-5th year level.
To provide a quick solution to this said problem I have two solutions that can be of help to the said problem:
First is I would like to recommend that there should be proper introduction, orientation and education for the said program. Proper introduction and education should be given to every teacher as to how the program should work so that any changes in connection to the student’s grades can be immediately done or the encoding of the grades will be finished on schedule. Since the teachers are already given the proper orientation for the program then their work will be done sooner. Having the student’s grades sooner will help the enrollment process to proceed smoothly. Considering that every teacher has their own personal computers, laptop or etc. then this solution is quite useful.
Second is that considering the factor that not all of the teachers have their own device to use I recommend that there will be a separate group which will focus on the program. Having a separate group, the teachers will only be submitting the student’s grades and the separate group will do their work. By setting up a deadline as to when will the grades be submitted then the separate group can start working and finish on schedule. Then the team will work on the encoding of the grades setting their own goal, when they will finish the encoding of the entire levels. This will definitely lessen the problem of the late upload in the student’s grade thinking that there will be a specific group that will work on the encoding.
The slow connection and the server traffic can really cause a huge problem especially to the teachers and the students. This will affect the set schedule, keeping in mind that the student’s grades are essential to the enrollment process. Having in mind that not only the teachers are using the program but also the students which has their own problems which is the cause for them to gradually monitor or use the program thus resulting to the said server traffic. This will be a big complication that would cause the server to be slow or eventually causing server down.
I recommend, having upgrade server connection which will resolve the slow connection. Having this upgrade will also make updates of course and grade uploads to be faster which will be helpful for accommodating a large number of users. In accommodating a greater number of users this upgrade will be of help which will also make any proceedings to be done on schedule. Thinking that the following proceedings will be done on schedule can resolve the previous problem. It is also nice to have an administrator to work on the program so that the program will be monitored timely and any problems concerning the program would be easily fixed because of the continuous monitoring of the administrator. The administrator will also be the one to work on the possible solution which can possibly rise anytime. Having the administrator to monitor the program will be useful thus further complication won’t be avoided since there are many users of the program. Though, considering that there will only be a specific group to work on the grade uploads would also help lessen the server traffic or congestion. Since, there will only be a limited group working on the student’s grade uploading then it would also lessen the number of users thinking that the teachers won’t be using the program too much.
Despite everything businesses change, and change is happening at a faster rate than ever before. So it is not realistic to expect no change in requirements while a system is being built. However uncontrolled changes play mess with a system under development and have caused many project failures. This emphasizes the advantages of shorter timescales and a phased approach to building systems, so that change has less chance to affect development. Nonetheless change must be managed like any other factor of business. The business must evaluate the effects of any changed requirements on the timescale, cost and risk of project. Change management and its sister discipline of configuration management are skills that can be taught.

The developers will do a great deal of testing during development, but eventually the users must run acceptance tests to see if the system meets the business requirements. However acceptance testing often fails to catch many faults before a system goes live because: poor requirements which cannot be tested, poorly planned tests meaning that the system is not methodically checked, inadequately trained users who do not know what the purpose of testing is and lastly inadequate time to perform tests as the project is late.

The scope is the overall view of what a system will deliver. Scope creep is the insidious growth in the scale of a system during the life of a project. As an example for a system which will hold customer records, it is then decided it will also deal with customer bills, then these bills will be provided on the internet, and so on and so forth. All the functionality will have to be delivered at one time, therefore affecting time scales, and all will have to have detailed requirements. This is a management issue closely related to change control. Management must be realistic about what is it they want and when, and stick to it.

Underestimation and analysis failures – Projects can be complex undertakings. However that complexity is often not immediately apparent when a project first begins. Instead, the team needs to carefully analyze the project and discover the complexities involved. Those complexities need to be understood before commitments to schedule and budget are confirmed. If commitments are given before the full complexity has been appreciated a project can easily end up making unrealistic commitments that ultimately create a pressurized environment in which the project can only fail. 

Risk failures – Predicting the future is a risky activity and because projects are all about creating the future, projects inherently involve risk. Where a project is blind to those risks they are likely to run into serious difficulties that they failed to anticipate. Those difficulties are sometimes serious enough to derail not just the project, but even the organization as a whole.

Risk exposure is a combination of the probability that a specific risk could materialize into a problem and the negative consequences for the project if it does. To manage each risk, select mitigation actions to reduce either the probability or the impact. You might also identify contingency plans that will kick in if your risk control activities are not effective. 

The systems database being hacked and resulted to the student’s grades and identification getting mismatched is really a troublesome thing. Judging from the said problem there is a great possibility of the grades to be reviewed from the start since there have been a mismatch not only the grades but also the student’s identification. However if the problem was disastrous enough then everything within the database will be repeated or they will have to start from scratch. This problem would have a big effect in everything since the database itself was the one affected by the hacking. The said problem is hard to prevent thinking that there is really a big possibility of it happening though not sooner than what is expected. There should always be a countermeasure to this problem.
Considering my recommendation to the previous problem there should be an administrator to keep monitor for the program. Having continuous monitor of the program will help lessen the possibility of the systems database to be hacked. Since the administrator has gained control over the program then any complications can be easily identified and will be resolve. Also, there should be a much stronger security provided for the protection of the students’ grades and students’ identification. This will also help avoid the problem wherein the student’s grades and identification will get mismatched. Thinking about the fact that the program was hacked then the previous security wasn’t proven to be strong, though the fact that there will always be a hole in every system then the security of the database should always be monitored and controlled. Also, the security of the system’s database should be constantly monitored and eventually changed keeping in mind that in our generation everything can easily searched through internet. There should also be a back-up file so that this problem can be quite resolved since there was a prepared file. Having a back-up file will help because the previous database will only be changed or replaced by the saved file. This will also lessen the work of the administrators given that they were able to prepare for the said problem.
Computer literacy should be observed considering the fact that there are others that aren’t capable of using the current technologies. Even though at this age we are being dependent on the said technologies but there will still be others which are not able to adapt to the said technology. So, proper education about the program should come first to help the future users of the program the idea what to do and what is the program capable of doing. Keeping that in mind will also lessen the problem of others getting caught up in the previously said problem. There should be proper orientation to everyone which will be using the program. This would help the users to be able to fully understand how the program works and how to properly use it. Having taught the users how to use the program would help them know which options to choose and buttons to click. It will also give them the idea where to go if they are looking for specific information about someone, something or themselves. The idea of educating the users first shouldn’t be neglected since the program itself is user dependent.
The main driver is the popularity of social networking, file sharing and video streaming sites. These changes in and growth of Web traffic are expected to continue, not only as the Web becomes a de facto front-end for many emerging cloud-based services, but also as many existing applications, such as game and video, are consolidated to the Web.



Second, the need for Web access also has grown, exposing the poor Web access problem for many users in bandwidth-limited environments. For example, the thousands of students that accessing the universities websites in one time and the teachers that uploading the grades and the administrator that uploaded the schedules for the semester, the problem remains for people who access the Web via cellular or wireless networks. As the deployment of mobile devices becomes increasingly widespread, the problem of poor Web access will be exacerbated. 

In order to improve Web access, we must first understand the underlying characteristics of Web traffic. Web traffic results from interactions among many components including clients, proxies, and servers, so only a detailed understanding of these interactions can offer insight for improving Web access. For example, analyzing end-user browsing behavior can lead to a Web traffic model, which in turn can be used to generate a synthetic workload for benchmarking or simulation. Also, investigating the Web page loading process reveals where the bottleneck lies in the user-perceived page loading latency. Furthermore, analyzing the redundancy of Web traffic and effectiveness of caching could shape the design of caching mechanisms. And so we increased the bandwidth of the server to manage the web traffic for the teachers and the students.

Slow connection will definitely be proven to be a problem. Having slow connection would affect the process which will be undergone by the users. This will be a problem to the users because having a slow connection might cause impatience to them. Since, users would definitely want to get done as soon as possible so they wouldn’t want to be caught up in traffic. But, having slow connection is also the same as being caught up in server traffic so having slow connection should be provided with an immediate remedy. There should be an upgrade to the connection to provide a fast working program which will be able to catch up to the need or wants of the users.
Server traffic is also one of the considered common problems to the program. Having a lot of users would definitely result to congestion. Therefore there should be a server upgrade to be able to utilize the program which will optimize the program capabilities. In doing so, there can be an increase in productivity and performance of the program, allowing a large number of users to use the program without delay and slow response times or failed connections. An upgrade will result to the program being continuously available for users and there would be guaranteed around the clock access.
Hacking was also considered to be a big problem since it has affected the system’s database. Since, the database is very important considering it holds a great number of information it should be well protected and secured. The fact that it is the main source and container of the student’s grades and identification there should be a much greater security placed unto it to avoid problems. The system or the program should always be monitored and controlled to be able to avoid hacking. The information in the database should have a back-up since the files within it are essential and are important.
Further information by the students is also permitted as they give great constructive criticism to the system. They are the first ones to use the system of course which makes them our great customers. There is someone who said that “The customers are always right” is always correct. We must understand the customer’s agony by fixing the codes that are in the system. Changing the system to a better one will surely give them happiness as what project managers must do. A lot of functions in the system must be implemented if this must be finished. The system must take full advantage of the current technology around us taking all the latest techniques in the internet, what they use and how to combat a threat if there is one. In this way we can safeguard the system with the necessary technology to ward of the hackers and make the system as faster as possible. There should be a full understanding of the system of course. A full understanding will make the job easier and less messy as programmers would be in confusion if this would happen. Also, further study is needed for this project. If there are more defects that stayed in the project and has not been seen or resolved then it would be wise to record it in a note or paper that will inform the future project manager on what to do or what they could succeed in times that we were not. After releasing the system to the public, there should be a testing phase so that the team can handle the old and new bugs that have been seen by the team that’s why there is a beta testing stage that will invite some of the students of the University to examine and create some opinions of the project that will make the team be aware of the problem or be proud of themselves for the compliment that the students give them.
Project manager are the ones that direct, co-ordinate and monitor the project with respect to all professional, technical, administrative, accounting, procurement and supervisory services and activities for the duration of the project. And the project manager provide the services necessary to assume responsibility for the phases of the project that includes preparation and agreement of performance objectives for the project, the achievement of the objectives and the supervision of the work to the extent necessary to achieve the objectives. A project manager should always remember that there are many things that should be considered before making any decisions. Just like in this scenario given, this is a problem which involves many factors: like people, time, cost and many more. These factors should be agreed or approved by the project manager and all of the other people who are involved in this matter so that everything will be fine when decisions are to be made.

I conclude that the system is absolutely useful to the university and also to the student’s which is a hassle free enrollment. This system would definitely be of help and it is effective. It would be a useful system which can make things done without any hassle to everyone through a good understanding of the program. The idea is great since it will make the enrollment process to proceed smoothly. Though, there will always be a fact that problems and complications might arise then it should be thoroughly studied before implemented. There should be a system assessment to see if it has produced good result until then the system should still be examined. By studying the system this would avoid complications, complications such as computer literacy, slow connection, server traffic and hacking. This kind of system would take a lot of studying because it has a large scale of users that will eventually depend on it. It should be well-planned to lessen the complications which have been cited. Great planning would really be essential to the succession of the program and also to the future usage of the program. 
0 comments | Leave a comment
Saturday, January 10, 2015 at 6:07 PM
with 0 rose(s)
CASE 5

1. What and who is the culprit of the G-World’s situation?


Reading on the case I can say that the culprit behind the G-World’s situation is the G-World itself. There were a number of reasons that has caused their situation. These reasons can be considered capable enough to cause the G-World’s problems.
There is a possibility of G-World giving too much compensation to the workers. Giving as much compensation to the workers is good. It is a good practice in keeping workers and as a large company this is common. Also, having focus on the compensation for the workers will cause the trust of the workers to the company to be strong. That would also help the workers to do their job well since the company has been well observant to their needs. This would also mean that the company doesn’t let their workers to be left working for nothing. So, I definitely agree to the G-World giving compensation to the workers. But, too much compensation will cause problems to the company. This problem might cause the downfall of the company.
This would involve the law of supply and demand in economics. Which is demand remains unchanged and supply increases, a surplus occurs, leading to a lower equilibrium price. For example the demand is the workers, the supply is the compensation and the equilibrium is the operation. So to say supplying too much to the workers even though there isn’t a change in their demand might affect the equilibrium of the operation. This sample can be related to the case. The mistake of the G-World for having no equilibrium to their compensation for the workers and their operational cost has been a miscalculation to their part.   
There was unbalance costing for workers and their operations cost. Having unbalanced costing between the workers and their operations cost has affected the company greatly. Since, the G-World has been paying too much attention to the compensation to the workers they have taken their mind away from the operations of the company. This problem has amounted to the miscalculation to the operation cost.
A great possibility of having low quality products sold. Having the unbalance between the workers and their operations has caused this problem. Selling low quality product has been the result of over compensation. The G-World might have ended up selling low quality products since the G-World was giving more attention to the compensation of the workers. This has also been the reason for the Client X being a seldom customer.
Also, another problem was the expansion of their business as an educational center. Due to lack of project management skills they failed to do the phases with regards the managing of their projects. To prevent such situations they should consider the project management phases.
Organizational and Planning – To be able to have a project progress there should be coordination. Being organized is needed since projects are required to be refined and detailed. When the level of organization is lacking project teams have a high risk of getting out of hand. And when there is imbalance the project can be possibly weighed down by unnecessary inefficiencies.
Leadership and Governance – With proper leadership skills they can make things happen. Someone who can lead his/her people can lead something into succession. But with ineffective leadership and insufficient governance process management control there will be failure in the management.
Underestimation and Analysis – Projects should be carefully analyzed and studied to discover complexities on an earlier stage. Projects shouldn’t be taken lightly because projects can be complex activities, complexities which sometimes are not yet evident on initial stages. Such complexities should be reviewed and understood before any commitments to schedules and the budget are confirmed. Projects fail when there are underestimations to complexities and under analysis are made. Thus, before committing to a project, complexities should be identified and there should be a counteraction prepared.
Quality – Projects are expected to work when they reached a certain deadline. However, quality is the dimension which is mostly getting too little attention. When quality is overlooked and there is insufficiency in testing there will be loopholes and flaws in the project which can possibly cause difficulties once the deliverables are deployed.
Risk – Projects involve risks and projects are visions of the future which involves predicting and forecasting trends that might arise which is quiet risky because it involves investment. A project is way too open for risks however predicting and forecasting possible risks for the said project can prevent any difficulties. Anticipating risks is the key to prevent the project from failing or even the whole organization.
Skills, Knowledge and Competency – Having skills can be helpful; having knowledge is the key however having competency on handling projects will lead the way to succession. With this expertise there will be a project success. Lacking in knowledge and skills the quality levels and productivity are getting lower, also the risk of serious errors or omissions arise fast.
Engagement, Teamwork and Communications – Project are made by people and most projects are made for the people. When a project fails to identify who their stakeholders are, or fails to engage and communicate with them, the project is working in a vacuum. Likewise, when the team has no collaboration, individuals would end up working in silos in which they prevent communications from flowing effectively.
Managing project risks. By simply identifying the possible risk factors is definitely not enough. Evaluating relative threats each one poses will help you to focus your risk management energy where it will do the most good. Risk exposure is a combination of the probability that a specific risk could possibly materialize into a difficulty and other consequences. Select mitigation actions to manage risk and reduce the probability or impact. Contingency plans should also be identified that will serve as the back-up when risk control activities are ineffective.
Planning time for process improvement. Allocate some time from the project schedule, because software project activities should include the making of process changes which will help future projects more successful. There should be proper time allocation for the team members, members shouldn’t focus 100% of their available time to project tasks. Other process changes can somehow begin to pay off immediately, however there are no guarantees there will be a full return of investment in other improvements until the next project. Visualize process improvement as a strategic investment in the maintained effectiveness of the development organization.
Lack of change management. The end result is always mare than expected when the scope creep will happen. Problem: The unplanned changes which are added to the project results to taking longer to finish, having costing more than what is planned and there are not records as to why. Cause: Unrecognized changes. Solution: Documentation of change management process which is to be used and will be followed by educating and evaluating the project team to recognize changes or deviation from the plan following the change management processes.
G-world's extending business is one of the key components that drive their circumstance today and there sure are things that are expected to be considered before growing a business:
Initially, are there economies of scale that will advantage such extended operation? As your business increments in size, costs per unit fall, bringing about lower costs or higher benefit - or both. You ought to just grow if economies of scale will permit your business either to offer your items or administrations at lower costs or to take more profit per item. How would you accomplish economies of scale? By developing your business, you may have the capacity to purchase more. As opposed to purchasing for a solitary store, you are currently purchasing for a few stores. Such high-volume buys will permit you to get lower costs for everything from crude materials to transportation, and stockroom space - even cleaning services. You might likewise be in a superior position to protect your business against value cutting by your rivals. As you branch out to different markets, you may have the capacity to offer more and build your deals. Bigger deals volume will permit you to balance lower per unit benefit. Your business might likewise profit from having more assets, as far as greater and better premises, expanded promoting assets and included item offers that give more esteem to clients. Your authoritative expenses per unit ought to additionally descend, as the expenses like publicizing; obtaining and different capacities are spread among all your areas and items.
Second, are your rivals expanding? Market insights ought to have key influence in your choice to extend your business. You may have the capacity to get clues about the business sector, and some sign about your rival's circumstance. Getting data about your rivals can provide for you the main edge, as it can reveal to you courses in which your organization advantage the client and be special. In the event that your rivals are expanding their operations, it may imply that they have seen new, undiscovered open doors in the business. Your rivals may have discovered a decent thought. On the off chance that this is the situation, you can do two things: lie low how the contender does, or take after the contender's lead. By sitting tight for the aftereffects of a contender's wander into another territory, you can confirm for yourself whether request truly exists and the profits exceed the dangers. Taking after your rival's lead does not so much imply that you need to copy precisely what they are doing. Rather, you can utilize their thoughts to invigorate your own reasoning. On the off chance that your rival's development turned out to be a mix-up, then you can be grateful that it was not your business that was blazed in an immoderate misjudgment.
Third, would you be able to back the extension internally? Before choosing, you have to study carefully the money related profits of such a development, and whether your money stream can help the extra venture. It is critical to figure out where and how you will get the cash to pay for the extra stock, new offices or gear. The perfect circumstance would be to grow just when you have demonstrated that request exists for your items or administrations, as demonstrated by your fat primary concern. In the event that you require extra capital, whether an advance from the bank or a value imbuement, make beyond any doubt that the new wander will be sufficiently productive to permit you to procure cash  and reimburse the advances. Numerous little organizations met untimely deaths with their forceful development method, where they would end up filing for bankruptcy or liquidate assets. Much the same as different business choices, we must create just when the danger is justified regardless of the take, however it may not generally be attractive. Development of an organization, huge or little, needs time to study the components that may upset their improvement, however gradual, still is considered as development.
Poor communication. Insufficient resources such as lacking enough people who will work on the project, the right skill tests, or even lacking of commitment by the team or team members to the project. Requirements are poorly defined where it does show or have the same requirements asked however it is not the same as how it is or was expected and/or supposed to be. Having poor management where there was no proper planning with regards to the possible risk in which the project would encounter and possible contingency plans for the possible risks. Incorrect estimates as to how large the project will be or how much the project’s cost will be. Badly defined deliverables wherein requirements of the project are unclear or are not clarified. Over optimism where there was no proper planning even before the deciding whether the project is feasible or not. Projects require a great span of time to be studied and analyzed before it is even implemented, it is reviewed many times whether it is feasible or not, and learning of the risks, advantages or disadvantages in implementing such a project is very important. Thus, without proper balance in the G-World Company’s planning and decision making it has created an imbalance resulting to its current situation.

2. What was Client’s X problem of not choosing Project One of G-World Company?


In speculating what are the reasons behind the Client X’s reluctance into choosing the Project 1 of the G-World there are a few basis that can be listed. The cause or the reasons behind the Client X for not choosing Project 1 of G-World are the following:
They might have studied that the Project 2 will do better that Project 1, thus disregarding thoughts of choosing Project 1 over Project 2. The thought of returning to Project 1 is very risk-taking especially when in the midst of handling Project 2. Considering the fact of going back to Project 1 will definitely leave the Project 2 in a rough situation, it can be unstable and uncontrollable. With the risks, there are no guarantee that Project 1 will progress the same as Project 2, and so deciding on to working Project 2 into a success and leaving behind Project 1.
The Client X might be thinking that the project implementation is ineffective and have the vision that it might not do well. There might have a problem in negotiation and association with the client’s explicit desire. If the Client X ended up into thinking that the project might not do well, then scenarios of leaving and dropping the idea of buying products in G-World. When client’s are starting to have second thoughts then that would be a rough situation for the company since they will have problem with sales considering that the Client X won’t be continuing business with them.
Considering the reluctance of Client X they might have messy or low quality products. Having low quality products would definitely affect the cost of sales for the company. The Client X might have been waiting for a new company to rise so that they can buy their products there. That could possibly be the cause for the Client X not to choose Project 1 of the G-World. The G-World is the only company that can supply the products that they needed before but now that the Universe Corporation has rise the Client X has been buying their supplies there.
Project 1 can also be considered as a problem, when the only committed party is the client while the developer and the team aren’t. Considering the fact that the Client X is committed enough to the project, they might have noticed that the team and the project manager have difficulties, troubles or miscommunication resulting or concluding to the reason of the projects ineffectiveness.
Given a scenario:
When going to or watching a basketball match audience will be anywhere in the vicinity. And, you as a vendor how would you effectively sell goods when you are in a stand? Considering that the audience wouldn’t want to miss even a single happening in the match. Definitely, they will just be sitting the whole match or even wait for the half-time before going out and buy drinks or food. As sellers you will have to attend to customers and by effectively attending you will gain profit. So, you will end up selling food and/or drinks inside the court, walking in the sideline. Even with unruly customers you will have to know how to deal with them.
And so, if I were to be the client in all probability I will be monitoring for updates and the products specifications: the design and/or the right specifications, which mean attending to my causes. However in all possibility of finding any problems with the product then I would end up declining and will not buy their products any further. Even with picking the right bets and discounts for the product but with the reluctance of the clients then that would really be a big problem.
Communication can also be considered as a factor in selling a product. If there was miscommunication resulting to misunderstanding between the client and the project manager there could be a product drop which can cause a real big problem to the G-World Company. Without enough ideas regarding the situation one can only speculate, thus there is also a possibility of having problems with updating between the client and G-World. When clients aren’t updated regularly or informed gradually regarding the product, then, definitely they will have an issue regarding the information which can arise into a bigger problem with the G-World.
The CEO of Vendio, a multichannel Ecommerce Solution, Mike Effle, knows a thing or two about offering great customer service. He offers 10 tips on how to turn a bad customer service situation into an opportunity to improve your business.

First and foremost - listen. Do not try to talk over the customer or argue with them. Let the customer have their say, even if you know what they are going to say next, and even if they may not have all the information or be mistaken. As you listen, take the opportunity to build rapport with the customer.

Build rapport through empathy. Put yourself in the customer's shoes. Echo back the source of their frustration and show that you understand their position and situation. If you can identify with a customer's issue, it will help calm them down. If you verbally "nod" during the call, the customer will feel better understood.

Lower your voice. If the customer gets louder, start speaking more slowly and in a lower t1. Your calm demeanor will reflect on them and will help them to settle down. As you approach the situation with a calm, clear mind, unaffected by the customer's t1 or volume, anger will generally dissipate.

Assume all your customers are watching. Pretend you are not talking only to the customer but to an audience that is watching the interaction. This shift in perspective can provide an emotional buffer if the customer is being verbally abusive and will allow you to think more clearly when responding. Since an unruly customer can be a negative referral, assuming they'll repeat the conversation to other potential customers can help ensure you've d1 your best to address their concerns in a calming way.

Know when to give in. If not satisfying the customer is going to take 2 hours and a bottle of aspirin and risk negative referrals, it is probably better to draw a compromise a bit more in their favor to give you more time to nurture your more productive customer relationships. Keep in mind that the interaction is not typical of most customers, and that you're dealing with an exception.

Never get angry or upset. If the customer is swearing or being verbally abusive, take a deep breath and continue as if you didn't hear them. Responding in kind will not solve anything, and it will usually escalate the situation in a negative direction. Instead, remind the customer that you are there to help them and their best immediate chance of resolving the situation - often this simple statement will help defuse the situation.

Never take it personally. Always speak to the issue at hand and do not get personal, even if the customer does. Remember that the customer doesn't know you and they're just venting frustration at you as a representative of your company. Gently guide the conversation back to the issue and how you intend to resolve it, and try to ignore personal comments.

Remember that you're interacting with a human. Everyone has bad days. Maybe they had a fight with their spouse, got a traffic ticket that morning or have had a run of bad luck. We've all been there, to some degree. Try to help make their day better by being a pleasant, calming voice – it'll make you feel good too.

If you promise a callback - call back! Even if you promised an update that you don't have yet, call the customer at the scheduled time anyway. The customer will be reassured to know that you were not trying to dodge them and will appreciate the follow-up.


Summarize the next steps. At the end of the call, let the customer know exactly what to expect and then be sure to follow through on your promises. Document the call to ensure you’re well prepared for the next interaction.

Involvement of the Client X with regards to the project should also be considered or put into mind. Perhaps the Client X was not glad with their approach in terms of the information, the operations, the guidelines, especially the updates that would really be a problem. Terms between the client and the company should always be considered since that is where they have provided what provisions they require. The operation of the company must be accompanied by informing the client if they have already started the products creation. The guidelines should be discussed between the client and the company since it involves both parties. Updating the client regarding the product is essential however the information that is being passed between the parties can be discussed while completing their own set of guidelines and terms. If they have come up with an agreement then both parties are tied up into continuing the production of a product for better or worst. However, when certain problems arise then that would require either of the parties to compromise. In this case G-World has compromised their Project 1 thinking that Client X has chosen Project 2 over it.
Since the problem is focusing on the Client X’s choosing Project 2 over Project 1. There are certain conclusions that can be thought up including the probability that the impact of the product or the project is not effective, which resulted to Client X being unimpressed in the performance stability of the Project 1. There can also be a prospect that Client X hadn’t chosen the G-World product because of thinking they weren’t involved with the project since the project manager did not approach them. When clients ended up thinking that the project manager is not interested with them that would start complications. Clients might conclude that they will not be able to produce the product they have requested or designed. And, if the clients’ unwillingness to buy the product was the result of the project managers’ uninterested approach then the product would be wasted and problems of the production will come up.
Feedbacks can also be a source of a problem. When a developer made an update the client should be informed and also clients gives feedbacks whether the update was useful of not. However, if the feedbacks given by the client wasn’t noted and recognized by the developer there will be a repetition of work, since the client would address why the problem why the next updates are lacking. And, if the feedbacks and other opinions given by the clients aren’t implemented then that will cause problems.
The Universe Corporation might have better products. There are few reasons why clients go to other producers one of those are better products coming from others. When clients change producers it would only mean that they are not satisfied with the previous product. People would always look for things that will satisfy their needs it is part of our nature. And thus, it also applies in businesses where consumers would go for better products, of course who would want low quality products? So, this factor might also have an effect as to why Client X did not choose Project 1 of the G-World Company.
The Universe Corporation may have offered better packages or they have low discount rate and big sales or bargain. With competition comes a great competition in discount rates and bargain. The possibility of Universe Corporation offering better exchange than of the G-World Company should also be observed since it can also be a factor. When having transaction with other producers, consumers would expect great bargain thus producers would give great packages so that consumers will buy their product. In this case there is a big chance that the Universe Corporation has a way better offer than of the G-World because a partnership between clients and a company, which is established for a very long time, can’t easily break just because of a new company rising. There are no other ways to explain it but this is also a possibility.

3. How are they going to manage the sudden drop off of Project 2?


A drop off of Project 2 would definitely be a reason for the rise of new dilemmas, however choosing Project 2 over Project 1 is definitely a better decision. If ever they choose to continue the operations of Project 1 and then there was a sudden drop off of Project 2 the company would have to handle both dilemmas at the same time, and there is a big possibility of Project 1 having a drop off way faster than Project 2. Taking risks without observing or considering the time will be your greatest leap of faith.
The sudden drop off might be because of the sponsors; the project design; the project supply chain management; inadequate skills and incompetence of the: project manager, project team; external factors such as politics and government policies in the area; economic factors such as interest rate inflation, currency exchange rates, variation, fluctuation and etc.; social issues such as human resources management, workforce diversity, cultural difference, language barrier and etc.; technology and information management; legal issues pertaining to statutory requirements of the project, the physical site, health and safety, security issues concerning materials, money, machines and workforce on site.
Wasted time, effort and money can longer be tolerated especially in these cases. Failing of projects are a great risk to business operations. The following are reasons why projects fail:
  • ·         Poor sponsor involvement, passive involvement of senior management, not enough commitment ate executive level, poor guidelines from senior management, poor management of executive level involvement;
  • ·         Poor end user involvement, poor business involvement throughout the project, poor management of user involvement by the project; Poor on-going planning, not enough time and effort on planning, poor contingency planning;
  • ·         Poor time management, time needed, time allowed, unrealistic timescales;
  • ·         Resources being taken off projects, poor resource management in multi project environment;
  • ·         Scope change, specifications change over time because of poor scoping; Lack of leadership, too much focus on method and not on behaviour, too little interpersonal skills;
  • ·         Poor project management discipline, poor project management practices and method, poor tooling, poor change management, poor risk management;
  • ·         Poor requirements specification, client uncommunicative; Wrong resources allocated (skills); Too internally focused, not enough alignment to changing business goals, not enough regulatory checks;
  • ·         Poor prioritization of projects, continual checking of business case, changing goals & demands of business; Unclear roles and responsibilities, role confusion, no accountability;
  • ·         Poor financial & costs management, poor checking of return on project investment, poor budgeting; Poor definition of outcomes, business case, how project supports business goals; Poor scope definitions; Poor knowledge capture, evaluation success and failure, learning from mistakes; Unmanaged expectations, unrealistic expectations;
  • ·         Poor quality management; Project managers without authority; Poor testing; Not enough focus on people, managing stakeholders, expectations, leadership; Too many projects in portfolio; Project results thrown over the wall.


Identifying them is one thing, but how to address them? Initially, meet everyone and speak with them the reasons, make them change for the better and improve themselves. There is no need of showing them the list however speak to them about the complications and are ways to solve these. It means to have them experience fails factors making them see and feel the consequences. The next step is to define and test solutions and make them experience the results. However, it shouldn’t be done in a live project environment. One, it is too costly. Secondly, it is too risky. Third, it takes too much time and effort to manage the learning process. This is why people are turning towards into business simulations as an instrument for learning-by-doing. Placing people into a simulated environment where they can experience the failure factors and more importantly the success factors all in a day. It will be no risk nor wasted costs.
To manage the sudden drop of Project 2 which is now considered as failure, here are a few suggestions as to how place it again on the right track:
Refocus the Scope. Begin by going back to the defining documents including your Charter, Statement of Work and approved Change Requests. Figure out what you have committed to accomplish. Conversely, document all of the things that were unofficially added to the project. What you are trying to obtain is a clear understanding of the commitments and the expectations of others. With these lists in hand, meet with the project sponsor or similar key stakeholders and agree on what should be part of the current effort.
Draw up the Schedule. Based on the remaining effort and current resources, recalculate the schedule. Forget the deadlines placed on the project at this point. Given the amount of work and people available, determine a realistic timeframe to complete the revised scope.
Determine the Cost. Find out what the budget is and how much has already been spent. After calculating the difference between the two amounts (hopefully it isn't negative) compare it to what remains to be done based on your revised schedule run the numbers to determine a reasonable estimate to complete.
Review Lessons Learned. Meet with the team and other stakeholders to determine where the project went wrong. Develop a list of steps to take in order to avoid the same thing happening next time.
Develop Alternatives. Using the scope, schedule and cost information review the options available based on the Project Triangle that pits scope, time and cost against each other, consider the impact of each of your options on those factors.
In some extreme cases the right decision will be to cancel the project. Although an unpopular choice, some projects need to be dropped. Reduce the testing phase is usually the popular option, but I don't recommend it. Admit Reality. Once you have drawn up a couple of viable alternatives, present them to the management team. Begin with a healthy dose of reality. Management does not like going through the failed project dance. If they have to do it twice things get ugly. Lay out the situation, preferably without playing the blame game. Then present your plans for getting back on track. Let them help you talk through the options and make suggestions.
Start Fresh. Issue a revised scope statement, obtain the funding, reset the schedule and obtain appropriate approvals. You have been given a new lease on your project. Work the plan and make sure to incorporate the lessons learned from your first attempt.
Project Triangle: Picture a triangle where each of the three sides represents scope (or functionality), time and cost. If you change one side it impacts the other two. Reducing the size of the scope side will allow you to reduce the time and/or cost side. It is the same for the other sides as well. This is a standard and effective way to communicate the struggle between the three. Read between the lines. Once you start getting wind of problems such as schedule, quality, cost, resource conflicts or late status reports, then I’d recommend a one-on-one review with the applicable project manager as soon as possible to determine the project’s true status.
Recognize what went wrong. Try and assess what the reasons were for the project failing in the first place. It’s no use simply blaming people. If the failure was due to bad estimation or planning, then efforts need to be put into place to correct any future projects following the same path.
Determine what to do. Should you cancel a bad project or try and bring it back on track? Organizations faced with bad projects should first try and salvage their poor performers rather than cancelling them. Educate your project staff. Training and education really go a long way to correcting bad project practices.
Create plans that will make your project even stronger. Initiate and plan the right project. Most projects fail from the initiation and planning stage. It is therefore, very important that the right project must be initiated and planned. Project initiation and planning can be categorized under two forms, Achievable and Speculative. Achievable projects are the traditional (common) projects like manufacturing a bottle, building a house etc., and uncommon projects like going to the moon, separating conjoined twins, beating a great team in competition etc.
Projects must be SMART (SPECIFIC in term of description, MEASURABLE in term of performance, ACHIEVABLE in term of scope, and TIMELY in tem of schedule). Bogus and over-ambitious projects are likely to fail. Select quality team members. Though the overall performance of a project team does not solely depends on the individual qualities of the project team members, quality team members have impact and can easily blend in a team to achieve team cohesiveness. Powerful team managers are fond of selecting those professionals that they have worked with and found capable of achieving results. The scope of work, cost, time and quality of project will determine the type of team members to be selected for a team. Strategize for the task ahead with all stakeholders. Failure may be perception of some stakeholders who believe products would have been produced in a better way if they were involved. Project manager should strategized using the stakeholders in a project development. The project manager should organize regular stakeholders' meetings where the project brief will be developed. The stakeholders, which include the project sponsor (owners), the project team members, end-users and statutory authorities and government/s or and their/its agents who give approval for project development, should be involved before execution stage.
There isn’t anything easy when handling a business; business owners take risks all the time. No matter how hard they’d try there are always problems to be solved and fires to put out. The sudden drop off of Project 2 means there was failure in the management. And the company must consider the following in managing the drop off:
Organizational policy - the company has not adopted a formal policy for managing projects. Consequently, informal and inconsistent approaches to project management are used with mixed results. This is a much more common occurrence than finding a company devoid of knowledge in project management.
Enforcement of policy and procedures - even though a policy has been established, it is not enforced. As a result, inconsistent results emerge. If a standard and consistent approach to project management is devised by a company, it must be routinely policed in order to assure accuracy and uniform results. It is one thing to enact legislation, quite another to enforce it.
Ultimately, project management represents discipline, organization, and accountability; which are three areas people seem to have a natural aversion to these days.
Discipline - In the western world, people tend to resist discipline because some believe it inhibits creativity and personal freedom. As a result, teamwork is often sacrificed in favor of rugged individualism.
Organization - Pursuant to discipline is the problem of organization. Again, in the western world, people prefer to maintain their own identity and organize themselves to meet their needs as opposed to the needs of the organization.
Accountability - This is an area people tend to rebel against the most. The approach to project management, as advocated by "PRIDE," ultimately represents visibility and responsibility to produce according to plan. Unfortunately, some people shun commitments and, instead, prefer to hide their activity; thereby they cannot be measured and evaluated. This is typically the reaction of people who are insecure. People who are confident in their abilities have no problem with the accountability issue.
  • ·         Identify the potential causes and types of problems that your business is suffering
  • ·         Analyze your income statements, cash flows and balance sheets to characterize your business’s financial performance
  • ·         Acquire the appropriate information critical to creating an economic forecast.
  • ·         Create a budget and use it
  • ·         Establish financial goals and embed them into your forecasting budget
  • ·         Restructure debt-length terms or reduce your interest rate to improve cash flow
  • ·         Sell certain assets to reduce your debt
  • ·         Improve your business’s marketing
  • ·         Use advisory services
  • ·         Deal with the facts – don’t delude yourself!


Many people fail to make strong enough plans that they believe in. They try to get their energy back up, but they can’t because they are still reeling from the first failure. Once again go back to step 1 and don’t move on until you are ready. When you have created a plan that you can get behind your action should come naturally. You shouldn’t have to force yourself to be motivated.

4. Is selling Project Two can satisfy what G-World is expecting?


No, Selling the Project 2 cannot satisfy the G-World Company expectation to come back and be again in paramount of the IT business specifically in selling IT products and IT services, because the company (G-World Company) needs to adjust and start again what the company has been doing before Project 2 was created. No one will be convinced on buying Project 2, if they try to sell it, with lesser number of people handling the whole project, in which sooner or later would probably result to an unrecoverable failure. As a suggestion, they should set aside Project 2 and take whatever may happen to Project 1. The company particularly the project should focus on Project 1 which gave them the output of their company’s main objective and the company’s main line of work which is selling IT products and IT services so that the company can recover and regain their integrity which the company already has before the company was devastated by Project 2. Because Project 2 affects the company’s main project which is the Project 1.
Though there was a conflict in between Project 1 and Project 2, and was clearly unexpected the company didn’t really want that the Project 2 to be sacrificed. G-World Company should accept the fact that they have to let go of Project 2. Even though the introduction of Project 2 is for the growth and betterment of the company it is also to make sure that their sales production will be continuous, and for some reasons, it is to have a supplementary and subsidiary business. Their employees were provided or given with the most compensation benefits, because if the company would just let the Project 2 and let the company’s problem in the conflicts of the projects, the company would probably fall and will have to file for bankruptcy.
The worst problem of all is the financial instability that comes with business. Paying all the bills on time and making payroll, when the income just isn’t sufficient, is probably not the thing that lured you into business ownership. Financial stress can come in the form of cash deficiencies, lack of profitability, insolvency or a combination of these. That is why starting a new project is not just that simple because it can affect the whole company and it could cause sudden rise or a heartbreaking fall or bankrupt to the company.
Different financial problems often require rather different strategies. Management decisions, technical difficulties and family problems can contribute in complex ways to greeting undesired financial outcomes. In many cases, a clear course of action to resolve the financial difficulties is not easily determined. A business that is experiencing financial difficulties is often in that predicament for several reasons. It is extremely rare to find a situation where a single management problem or decision is the sole cause of poor financial performance. The consequences of financial difficulties will be low profitability, liquidity or solvency. The underlying cause will generally be associated with one or more factors – efficiency, scale and debt structure. The problem areas most closely related to business cycles are sales, financing and employment.
During a recession sales and financing generally increase in problem severity while employment issues generally become less of a problem. The pattern is reversed during times of economic expansion. Sales and employment problems illustrate these patterns more clearly than financing. Problems related to financing have generally eased over time as lending have become more standardized with the advent of credit scoring and financial services deregulation, and the cost of borrowing has decreased sharply.
Managing software projects is difficult under the best circumstances. The project manager must balance competing stakeholder interests against the constraints of limited resources and time, ever-changing technologies, and unachievable demands from unreasonable people. Project management is people management, technology management, business management, risk management, and expectation management. It's a juggling act, with too many balls in the air at once. Unfortunately, many new project managers receive little training in how to do the job. Anyone can learn to draw a Gantt Chart, but effective project managers also rely on the savvy that comes from painful experience, coaching and survival tips from people who have already done their tour of duty in the project management can save you from learning lessons the hard way.
These business goals should imply specific project success criteria, which should again be measurable and track able. They could include achieving schedule and budget targets, delivering committed functionality in a form that satisfies customer acceptance tests, complying with industry standards or government regulations, or achieving specific technological milestones. Remember that not all of these defined success criteria can be your top priority. You'll have to make some thoughtful trade-off decisions to ensure that you satisfy your most important priorities. If you don't define clear priorities for success, team members can wind up working at cross-purposes, leading to frustration, stress, and reduced teamwork effectiveness.  Also, keep your eye on team member job satisfaction, sometimes indicated by staff turnover rate and the willingness of team members to do what it takes to make the project succeed.
The business objectives define the overarching goal, though. It doesn't matter if you deliver to the specification on schedule and budget if those factors don't clearly align with business success. Needs are essential to one’s survival, while wants merely express a desire for something which could over time, help to satisfy a need. As societies become more complex, and as human begins take on more sophisticated lifestyles, their needs and wants increase. Therefore a variety of needs and wants are expected to be satisfied.
Every project must balance its functionality, staffing, cost, schedule, and quality objectives. Define each of these five project dimensions as either a constraint within which you must operate, a driver strongly aligned with project success, or a degree of freedom you can adjust within some stated bounds. There's bad news: not all factors can be constraints and not all can be drivers. The project manager must have some flexibility to react to schedule slips, demands for increased functionality, staff turnover, and other realities.
Since I consider this as a project failure, let’s first discuss how to bring back the project through project recovery and if selling Project Two can really satisfy what G-World is expecting. These are the common steps in achieving project recovery process.
Common Recovery Theme. Remember the TV series M*A*S*H? Whenever they had an influx of injuries, the first thing they did was "triage," which by definition from Encarta states that it is "the process of prioritizing sick or injured people for treatment according to the seriousness of the condition or injury." In effect, they didn't rush in and try to heal the first injury they saw - they did an overall assessment of how serious each casualty was then worked on the most serious problem first, working down the priority list until everything had been treated. In project implementation terms, there may be all sorts of things going wrong, such as being behind schedule, over budget, under resourced, or having poor quality deliverables leading to non-acceptance. So how do you recover from this imminent project failure? 
Preventing Project Failure. The first thing in project recovery is to evaluate the overall project - an audit or project review using a series of standard questions should identify the key problems and the severity of each one. This will allow you to prioritize project recovery planning and activity so that you tackle the most serious problems first, and then work down the list. During the review, you might find some areas where you can stop the bleeding - for instance, if scope is unstable and forever changing, the introduction of a strict change control process should at least help to firm up and stabilize the scope. The degree of project planning for project recovery will vary from project to project - some projects may need a full anesthetic (stop all work) to allow an operation to be performed (redefining scope or even another round of project planning). Some may need a plaster cast to immobilize a broken part (to prevent any more changes to scope until the project is stabilized), some areas may need a bandage (some corrective measures that may restrict progress but not stop the project), some only need a sticking plaster (minor corrective measures that have minimal impact on overall progress), and some just need some TLC (smooth out minor issues). 
Recognize When Project Failure is Unrecoverable. After evaluation of the troubled project you may determine that there is no good business case for project recovery so we may need to cut our losses and move on rather than waste time and money on project recovery planning. In this case, of project failure, we need to plan euthanasia - let the project die as painlessly and with as much dignity as possible. A failing project needs the help of a well-trained project planning professional, also called a recovery Project Manager to minimize recovery time, cost, and residual damage if the project can be saved, or to recognize when euthanasia is the recommended option. 
Selling the Recovery Plan and Motivating the Stakeholders. Once the project planning professional has performed triage and avoided project failure, he has to be able to create and "sell" a prioritized recovery plan to all stakeholders. Communication is critical on any project, but it is particularly vital during project recovery where there may be a demoralized team, furious customer, nervous management, and unhappy bean counters to satisfy. When the plan is accepted and project recovery is under way, the project planning professional must be able to motivate the team to reach for success, pacify customers and give them confidence in eventual success, and provide the bean counters with a realistic plan that can be regularly measured and reported on. Progress must be carefully monitored, controlled, and reported throughout the recovery and responses to unplanned events (risks) should be decisive, quick, and effective or we could be facing further project failure. Finally, during the recovery period, it is important to keep your team positive - build in milestones to allow you to publicize and praise even small achievements. Build a momentum based on success, so that the team and other stakeholders perceive it as "normal" to meet milestones, and in contrast, missing a milestone is unusual and stands out amongst all the other successes.
In general, the only way that others will accept project management is if they see the value that it provides. These four strategies are directed at demonstrating the value of project management to others:
Use the Credibility of Others. I don't know why this happens, but people will believe something they read in a newspaper, magazine or Web site over what a colleague tells them. This doesn't make sense, but if this is the case, then let's use it to our advantage. Find articles in popular publications that support the use of project management and use them to sell the ideas internally.
Start Simple. If you try to implement an entire project management process all at once it will be too overwhelming and will end in failure. Two of the common problems in projects are team member being unclear of what they are responsible for and the team not being clear on what the project needs to deliver. By starting with a definition of each role and the related responsibilities, we can help team members better understand the unique contribution they will make to the team.
Use Common Language. It is easier for people to see value in things that they understand. If the terminology and language that you use is too technical or unfamiliar, people will have a hard time seeing the value in project management. Make sure you use words and phrases that are familiar to those you wish to reach.
Get Referrals. Some people will trust the judgment of their peers, so one way to reach them is to have a referral from a satisfied client. When you do good work on a project for a client (internal or external), ask if they know any other projects that might benefit from some of the steps that you followed. If they can give you a referral, it is the highest form of compliment because they are willing to put their own reputation on the line for you.
I can conclude in business you should be a good decision-maker. What will happen next will be up to the choice you have decided. However, even with good decision-making skills there will always be problems. Addressing the problems, conflicts or even complications of the projects is never been easy. It is hard to accept particularly with large companies, but addressing the problems of the projects would be the best answer or decision especially when a company experiences this kind of conflict. It will be a matter of knowing when to continue a project and when to stop a certain project.

References: PMBOK
http://www.investopedia.com/terms/l/law-of-supply-demand.asp
http://www.businessnewsdaily.com/2864-customer-service-tips.html



0 comments | Leave a comment


+
project management

Shay here!...
Well I'm... 20. Senior?. University of Southeastern Philippines. BS in Information Technology.
I ♥ Sweets!. Marshmallows. Cakes. Ice Creams. Donuts. Chocolates.

When I'm Bored? I... Read. Eat. Sleep. Surf the Internet. Watch Movies.
Play Online Games.
«