1.   What phase of the project do you think causes it to fail?

              Projects are prepared or planned thoroughly so that one can have satisfactory results. It is not advisable to work on projects within a pinch of time because it might cause a problem for the project. Every project has to follow processes, these processes guides the team working on a project. In following these processes one can have a lead and it will be the key in fulfilling the project at hand. There will be a lot of confusion and difficulty in making the project that is why applying these processes will result to the project in the making to be at ease. Having prepared for the project processes would be an advantage because in doing so, the team can do their individual work based on the planned process and the team can have their schedule in every work they would have to do. So all the team needs to do is to follow on the processes so that they won’t be confused and they wouldn’t have hard time thinking along the way. By having these processes they will be ready and they can easily find a solution on the problems that might arise because they already have a project process. There really are different kinds of process group that one should follow; it is the initiating, planning, executing, monitoring and control, and closing process group.
          Basing on the given project case, the team working on the project did encounter a lot of problems. There are problems that are in connection with the time schedules, project manager, the team, communication and a lot more which made the project unsuccessful. Though, it was made a lot worse because they have failed to do the right project phase or process.
          They failed in the initiating phase or the initiating process group. But, what do you do in the initiating process group? In the initiating process group, it defines and authorizes the project or the project phase. By initiating process group the entry criteria are verified, including the availability of the required resources. Whatever requirements that the team has been found needed for the project or the resources that they would need to have for the project they want to finish.
           The team would have a hard time if they weren’t able to formulate the right ideas and things to do while they are in the initiating phase. If the team wasn’t ready or didn’t clearly think of the initiating phase then there really is a big chance of the project to have problems while it is still in the making. Failing to do the right study on the project might cause underestimation which would cause miscalculation. If there will be miscalculation in the initiating phase then it would result to problems. The initiating process group is one of the key roles in making a project because it would be the very beginning or the process which will identify what would be needed in the project. This would also be the phase wherein the team would be able to speak up on what they would need to be able to finish the project. This would be the phase where they’d gather all of the required resources and the phase that would confirm every decision that have been made by the contractor and the project team.
        They also failed on the planning phase or in doing the planning process group, but what is it? The planning process group defines and refines objectives, and plans the course of action required to attain the objectives and scope that the project was undertaken to address. Having a good planning process group can help gather information from many sources with each having varying levels of completeness and confidence. The planning processes develop the project management plan. These processes also identify, define and mature the project scope, project cost and schedule the project activities that occur within the project. As new project information is discovered, additional dependencies, requirements, risks, opportunities, assumptions and constraints will be identified and resolved. Significant changes occurring throughout the project life cycle trigger a need to revisit one or more of the planning processes and, possibly, some of the initiating process.
They have mistakenly ignored or they didn’t give much attention in this phase. It is the phase where the team would have to think of the ways to proficiently do what are the necessary actions for the project completion. To plan what are the right schedules so that the team would be able to do their work in full cooperation. Seeing through the case they weren’t able to plan very well because they have different time table and the team wasn’t able to fully cooperate in the project. They really lack project planning because of their lack of communication with the team and because of that it was like they were working individuals. They weren’t prepared on the possibilities that would rise as a hindrance to the project. It might be that they have underestimated the project and they didn’t think much of other factors that might have occurred in the midst of the project making. They lack proper conceptualization in connection with the project because they weren’t able to formulate the possible happenings that might come up and the proper solutions for these problems.
          Time was one of the essentials in the making of the project and also it was one of the things that the team lacks while they are working. The time that they have allotted in making the project wasn’t enough to cater the every needs of the project. They have possibly thought that the time given to the team to work on the project was already enough, but it has become one of their biggest errors in planning. Clearly, they haven’t thought of the constraints in their individual time and what would be the best solution to it. Following the planning phase and doing the given work on time is a good thing and a good example. By doing that, it proves that the team is showing complete cooperation and focus which can be prove handy if they aim on finishing the project. Creating and setting up schedules in the planning phase would maximize the given time in creating the project. It would also contain and resolve problems in the expense of a little time because of being prepared. It would also conserve time which is excellent while working on the project. Time management is very crucial while making the project because it could be the means of the project to fail or not.
The team should have thought that if they weren’t able to look through on the planning process then the project could fail. Misconception and the failure to plan what would be their course of action has made the project to fall short. There might also be other instances that the team wasn’t able to gather a great number of information that the team would have needed, so it only means that they have not optimized and attain full understanding in the planning process. This also means that they have not thought through the project with all angles or so to say with every possible outcome while they are working. This only a proof that studying the project and brain storming with the team can prove to be an essential into the finishing of the project.
They also failed in the executing phase or the executing process group. The executing process group integrates people and other resources to carry out the project management plan for the project. It is consist of the processes used to complete the work defined in the project management plan to accomplish the project’s requirements. This process group involves coordinating to people and resources, as well as integrating and performing the activities of the project in accordance with the project management plan. It also addresses the scope defined in the project scope statement and implements approved changes.
Cooperation is also an essential in the project making which the team has completely put aside. There were lack of cooperation between the team and the project manager which has been proven a mistake. The project manager not being able to cooperate with the team members is one of his/her fault and they weren’t able to come up with this probable happening to occur. The team wasn’t able to provide a quick solution to this problem and it took a lot of time. There were problems in the project that wasn’t quickly provided with a resolution which made it harder for the team.
Whatever changes that the team has thought of are part of the executing phase. If ever there were changes then it should be executed immediately so that the idea won’t be dismissed. In their case the things that they have planned wasn’t followed and so they also failed to execute the right processes resulting to the difficulties in the project. The team should have to organize their planning phase so that in the executing phase only the changes that have been proposed are the remaining problem. But, there would be other occurrence that might come up the team will just have to review on the planning phase and if it is already resolved then they can continue working on the allotted time for the executing phase.
They have also been proven to fail on the monitoring and controlling phase or process group. Monitoring and controlling process group regularly measures and monitors progress to identify variances from the project management plan so that corrective action can be taken necessary to meet project objectives. It consists of those processes performed to observe project execution so that potential problems can be identified in a timely manner and corrective action can be taken, when necessary, to control the execution of the project. The project team should determine which of the processes are required for the team’s specific project. The benefit of this process group is that project performance is observed and measured regularly to identify variances from the project management plan. It also includes controlling changes and recommending preventive action in anticipation of possible problems.
The project manager wasn’t able to monitor the progress of the team and what they have been doing in the past months. Communicating with the team should have been one of the priorities of the project manager since the team is just subcontracted. By following up on them and in the project will only show that the project manager has observed the every development made on the project. Also by monitoring, whatever is the inconsistency between the project and the project plan can be easily resolved. In gaining control, whatever corrective actions that should be applied can be easily concluded and changed. The project manager should have been active in monitoring the team so that they can be guided and no matter what action they decided to do is always observed. Monitoring and controlling the project execution and progress should be timely watched by the project manager so that he/she can manage the changes made and prevent actions that might be proved as an inaccuracy.
In doing a project the team should be prepared and has everything well-planned, having a process to follow so that there can be a lead. Providing a process to follow can help the team lessen their worries and that everything can be straightened out. A process can be proved essential because following these processes, the team can be able to easily do actions to help the projects progress to be faster and they can easily to corrective actions if necessary. Also, by being cooperative and always having communication within the team the project can be monitored and is well observed. There should always be proper communication with the team so that whatever they have decided to do can be executed immediately. They should also be time conscious and they should follow the time frame planned so that whatever they do it will go as planned by the team. Since time management is one of the things that has a great role in the completion of the project it should always be observed.

2.   As a project manager how would you proceed with the recommendation of the LGU?


Being a team leader, a project manager has a big load of responsibility. Deciding every action to make, thinking what would be better and having the image of what could be the best for the team, the group or the project itself. To be the one carrying out every problem, solutions, possible outcomes of every assessment that is made and every idea that would be the best for everyone. However, having every single responsibility rely in your hands, it would make every decision matter and every mistake account to you. Being a project manager you may have the power to hold and manage people but as what they say, “Great power comes with great responsibility”. The project manager will be the one responsible for the good, bad, best or worst outcome that will possibly happen in the progress of the project. The person who will be the one accounted to be the man behind the work of his team, their guide and their person in charge. The work his employees will clearly reflect on how he handles them and how he manages everything within the team so if the employees won’t do well it might also reflect to him as the one who manages them. But, you can never expect that the person managing the project is the one responsible to the failure made by the team because as a team they can be accounted as one.
Considering the project case the LGU had some propositions concerning the project. What are the recommendations that were given by the LGU?
First, the project development was months delayed (almost a year and counting). Second, the software was not user friendly and last but not the least, the software presented was still incomplete. These were the given recommendations of the LGU which is in connection with the project development. How will I proceed with the recommendation of the LGU, if I were the project manager? If I were the project manager, basing on the recommendation of the LGU, would like to appeal to them to continue the project that is unfinished. If ever that the LGU will approve, I will proceed to the following actions:
I will recreate the team or regroup the team so that the software development can proceed as what is planned. In doing so, there will be a new team and that the LGU will be able to look forward to the new team. By recreating the team it would still comprise of the system analyst, the three developers/programmers. As a newly created team we will work on the incomplete project or else if ever the LGU would request for a new project, depending on the decision of the LGU. Considering the decision of the LGU, whatever is decided then it will be duly applied or worked on.
I will set milestones which will help the progress of the project. By setting up these milestones will make the overall process manageable. So, there will be breaking down of the project into various goals which will be set as stepping stones that will be accomplished along the production of the project. This will help the team, in dividing it there will be bits of task making it easier for the team to accomplish, in a productive manner. We will set these tasks to be a step into achieving the overall goal. It will also help the team which is working on the bits of the project, in a way it will be able to timely work on these little tasks which will have to be done. This would also help the team to work with their own pace since they won’t be rushed.
We will restart the initiating phase since in this phase the past team has failed to work on the right process. By looking through the past initiating done by the past team, problem that they have encountered can be avoided or because of this we can be prepared if ever the same complications arise. We would have to review or construct a new plan so that everything can be noted since there are problems that would just accidentally arise or there would be constraints that might pop-up then the team can be able to prepare. Being prepared in random problems that might come up is better than facing the problem without a counter measure. It would be like going into war without having any weapons to fight.
As a new team we will have to construct a new planning phase so that we can redefine the objectives and so that we can analyze what would be the best action to take. In doing so, we can gather new resources and review the past plan made by the former team being prepared what to do if ever there would be problems that might arise. Preparing the team to a whole lot of new project schedules and activities provided that it is reviewed, and would help attain the objectives and scope that the project would have to undergo. This would greatly help the team since the planning phase is reevaluated.
I will have to set up a new communication plan to be able to update the LGU timely about the progress of the project. In this way, the LGU will be consistently posted about the project developments progress. It will also keep the team duly monitored and kept under control while working on the project. Keeping the LGU posted will be of help because the LGU might have requests regarding the project so the team can be able to work it out, fast. Having constant communication to the LGU is good; they might want changes in the project and because of this communication these changes can be applied early. So, stable communication to the LGU may help the fast development of the project.
Being the project manager I will set schedules that will suit the schedule of the newly created team. In doing so, we will have proper communication and updates could be a lot faster since we will be working within the same time. Being able to remain intact would help the progress of the project to be faster. There won’t be a problem on the team unless there would be personal problems that would come on the way, though having the team intact is already a good step into finishing the project. There are times that the team members rely on the project manager so being able to work in the team in complete accord would help lessen the constraints. Also, being able to be present in the phases that the team will come across would be good to be able to easily provide the team assistance, if ever it is needed.
We will have to recreate the executing phase. By having reviewed the executing phase the team would be able to keep track of the changes that will be or have been made in the project. The executing phase will come smooth if the planned action didn’t go wrong. Since the executing phase is a phase where everything would have to keep on moving forward there should still be monitoring to do. There should be a lot of following up to do because there will be a number of changes to apply in the executing phase since the executing phase doesn’t really remain constant. By keeping track of these changes in the executing phase if ever there are bug or if there are problem in the project the team would be able to detect it quickly and execute the proper action for the said problem.
We will have to fix the BETA which have been undergoing for testing and has been unprogressive for months. Working on the left work will make it faster since it is already started and there will be fixing left and we won’t have to recreate the whole software. Fixing the BETA can help so at the least it can work and will be able to continue in the user acceptance testing. By fixing the BETA this would also mean that the LGU can use it and can proceed unto the instruction phase where they will have to teach the users how the software works. This will be a great help since the users can be able to try and would be capable and competent enough before they will be able to proceed on the final software.
The software will have to be reset so that it will be user friendly. By resetting the software, we will have to observe on the need of the LGU which requires the software to be user friendly. Since, not everyone is knowledgeable about such software then this problem should be one of the things that have to be complied. In doing so, the software progress will be able to meet the terms provided by the LGU which is having it to be user friendly. Undergoing the resetting of the software resolving the problem involving the user interface will help out the team because being able to solve it will also mean that the team can work unto the other complications.
The modules that have bugs and the other modules that are unavailable for testing should be finished or should have to get done. In finishing the debugging of the former bugs found in the modules that would make the team proceed to the awaiting task. Working on the other modules that are still unavailable for testing should be done on schedule so that if there have been changes to be applied it will be done without taking too much time.
There will have to be constant or continuous monitoring and control of the progress made with the project. Keeping track of the progress of the project can also mean that the team can provide proof of the improvements that have occurred in the project to the LGU. Having monitored the events would also show that there have been developments in the project ever since the project have been restarted. There would also be a need to monitor the user acceptance testing. Keeping track on the user acceptance testing will help the team take note on the progress of the software. It will also be useful to the project because the team will be able to refurbish bugs and in doing so the team can work on the changes that has to be made. By gaining control of the projects changes anything can be easily accomplished which would help lessen the time usage. Changes that have to be done can be easily located by the team because every move the team has made will be properly observed. In gaining monitor and control will make debugging lighter since every action made in the project have been kept tracked.
The closing of the project should be formalized. The closing process will definitely show the end of the project, product or the service made by the team and it will have to be properly observed. By having the closing process it would also show that every activities that involved the project should be erased or terminated because that would show that the project has been made or done. This will signify the end of the project deciding whether the team was able to meet the expectation of the LGU. This also means that the contract has come to an end, and if ever the project failed that actions will have to be discussed. However, if the team has finished the project then it also means that the project management in that company is effective and successful. And, that would also mean that the team was good enough to show finished and satisfying results.
As the project manager working for the completion of project is one of the main goals, but managing the team is one of the steps that would lead to the reaching of that goal. There is a big responsibility residing in the position of the project manager though being knowledgeable enough can lead to the success of the project. If the project manager is able to assess the right things to do will help to the team and the project development.

3.   If you're a project manager, will you declare it as a failure? Why?


      Since project management is no small task. It has definite beginning and end, and is not a continuous process. Project management uses various tools to measure progress and track progress tasks. There are techniques, guides, methods or certain patterns to help manage a specific project. Project management has various ways in which a project is initiated, planned, executed unto completion. There are times that a project fails or a project ends up incomplete. True enough that not all projects end up successfully but there are many reasons behind its failure. In this case there were problems that have caused its failure. These cases proved to have a great impact which caused the project to fail. The project from the very start wasn’t viewed to be complicated or it was just taken easy because the actions made by the ones involved in the case doesn’t seem to show that they have shown effort since they have left the project halfway through and left it hanging. Given the situation, if I were a project manager, would I declare it as a failure?

     If I’m a project manager definitely I will declare the project as a failure. There were a lot of unfinished and practically the project was still undergoing the user testing. A lot of things can be noted about the project. These complications can be provided with solutions though.

The project development was months delayed. This issue can be considered as one of the basis of declaring it as a project failure. Having it delayed might be a result into some complications between the LGU and the EMCA for not being able to finish the project on time or on schedule. It will be considered a breach of contract since the team wasn’t able to finish the project. Though the contract was not discussed definitely this issue will surely appear if the unfinished project was to be discussed. But, in the general idea this reason has a big impact and has affected the project. The project should have been done in one year time but what happened is that the project is still ongoing testing and debugging. Clearly, because of this reason one can say that the project is considered as a failure.

The software was not user friendly. Seeing the software to be not user friendly it is a complication. This problem will result to improper use of the software. There is a big possibility that the user wouldn’t be able to use the software properly and it might cause many problems. It would also be hard on the part of the user because they would be able to optimize its usage. It being not user friendly will make things worst thinking that the project was months delayed and it not quiet sociable for a user. If ever the project did succeed the software would cause a commotion to the users. The developers should have keep in mind that not everyone is capable enough to be able to understand such software because there are different kinds of users, users that are young and active to understand and old which might make it harder for them to be able to catch up.

The software presented was incomplete. This would only show that the project can’t be used and it won’t be useful to the LGU since it is still incomplete. But, the idea of it being incomplete will either be good for the LGU or not. I can say that it is good because the thought of it being incomplete will give an initiative to the LGU that they can be able to innovate the project. Though, the project really is incomplete so one can easily conclude that the project really did end up as a failure. Presenting an incomplete project then it is also the same as presenting a half baked effort since the project is still incomplete. Showing the project as incomplete might give an idea that the team wasn’t able to do their jobs well and everything didn’t go according to the project plan. Since the project wasn’t completed then there won’t be an application of closing the project unless it is already concluded that the project won’t be continuing any further.

There won’t be a team to work on the project. Losing the team would also mean that the project would remain as it is, though technically the LGU can rehire developers or regroup a team. This would also mean that if there will be a regrouped team whatever is left will be for them to finish or they will have to rebuild the whole project. Having the team work on the incomplete project might make the development faster or harder for the new team. The loss of the team or the other members has resulted to the project being unprogressive and definitely the failure of the project.

They have failed to observe the initiating phase. The initiating phase is the most crucial phase since it’s the phase where the scopes are being defined and the criteria are being verified looking over the availability of the resources. Failing on the initiating phase would deal a really big problem to the following phases and since they failed already on the initiating phase then the result was clear, the project failed. They have failed to do the right study on the project that might have caused underestimation which resulted to miscalculation. By mistakenly concluding an idea to the project might have caused it to fail. The initiating phase should have been taken a thorough study since the initiating phase is where you have to define the scope of the project. Also, whatever the team wants to voice out should have been said in the initiating phase so that whatever it might be then it will be already heard by everyone involved in the project. Since, they have voiced out what they might need then any resources and such will be prepared so that it will be of help to the team. The team should be open enough to tell what can be of use to them or what they need also the things they ought to know that might be helpful for the project. Failing to do so caused the failure of the project. Therefore someone working on a project should keep a close eye on the initiating phase to avoid any further complications within the project cycle.

There was improper planning of the project. By failing to plan the project is also saying that they have planned to fail. The planning phase has also a big role in the project cycle since this where they will have to define and refine their objective and plan through what would be their course of action. If there has been improper planning within the project then the objectives that the team has constructed won’t be attained. Failing to plan might cause a problem to the development of the project management plan. It would affect the project scope, project cost and the schedule of the activities that would occur within the project. There would be times that one might discover new project information, not being able to plan the project effectively might add dependencies, risks, assumptions and constraints that would cause the project to fail. Also, constant changes definitely happen while working on a project so not being able to plan ahead what to do would cause to the failure of the project.

They didn’t work as a team. That project was supposed to be worked by a team but it seems like it is worked on singly. Nevertheless, because of the team slowly breaking up leaving only the system analyst it made the job a lot harder. Them, leaving the team made the progress or the development of the project a lot slower and were beginning to be unprogressive. That problem should have been found a way out because leaving it as that has completely made the project stop on its track. If they have full cooperation concerning the project then I suppose there would be a different result. One of the reasons why the project failed was because the project manager wasn’t around during a particular event where he/she was supposed to be present. That happening has made the team unstable since the project manager wasn’t there to guide or help the team if ever they needed something. Working on a project needs to have presence and the sense of responsibility since it is a task which is expected to have results, though without these results it is a failure.

There are modules that are still undergoing debugging and other modules aren’t still available for testing. Given the fact that other modules are still undergoing debugging then that would mean that they would have to finish these modules first so that they can move on to the other modules. These modules should have to be done so that they can work on the awaiting modules. If they have left these modules still in debugging it might be that they weren’t able to have the resources they might need or it might be because of the complications that have arise while they are working on the project. Not being able to debug the modules on hand has taken a toll on their schedule since they would have to get it done first before moving on to the next. They should have finished the other modules based on their planned schedule so that the other modules that aren’t still available for testing can be done within schedule. This problem can be considered a factor in which has caused the project to fail because they were caught in the middle of the module which is still being debugged and it has slowed them down. Them, trapped in this complication made the project to fail since it will have to take them time until they can finish the module, and since the team has been split up and the system analyst is the only one left it has definitely unprogressive considering the fact that only a few is left to work on the project and it is behind schedule.

They have failed to keep monitor and control. Not being able to monitor the project was one of the causes of its failure since the development of the project wasn’t regularly checked. This would also say that they haven’t paying too much attention o the project. If they have monitored the project well then they would be able to easily track down the cause of the slow progress of the project. By gaining control of the project would help so that any necessary actions that were taken can be duly monitored. Failing to monitor and control the project performance might also be hard because it won’t be observed and measured regularly. They might have failed to control changes and wasn’t able to anticipate possible problems that they may have encountered.
Due to these reasons I can say that the project has failed. Everything should have to be well studied and the project should have to be planned so that the progress of the project will be fast. Though, there would be times that the project can’t be done in a moment, the least that the team would be able to do is that to be prepared and to know very well what would be the best action that can help the production and the progress of the project.   The team should have to do their best to finish the project because it is a task they have accepted and signed. Keeping that in mind the team shouldn’t have split and continued to work for the project because they have accepted the project. It can be a basis for them to work together though based on the circumstances in the case that didn’t help to stick them together; it might be that they didn’t see it as a reason to stay. So, definitely in the initiating phase as they were just creating the group it should have been comprised of people who are willing enough to do the work and see to it that it would have satisfying results.

4.   What steps would you do to make it succeed?


    There are times that a project fails or a project ends up incomplete. Some projects can be completed though with the right processes to undergo and more. A lot of problems and complications might arise in the midst of working on a project but there are a whole lot of possibilities to have every solution one might need. True enough that not all projects end up successfully but there are many reasons behind its failure. One can’t easily blame anyone who’s working on a project unless it is really done on purpose or if that person wasn’t able to comply to his/her fault. Since, they were a team then they should share the same responsibility regarding the project unable to be finished on schedule. They should be fair enough to view the project equally and also the fact that they weren’t able to complete the project given to them.

Looking unto the case there were a number of problems and constraints that has pop-up making the project considered as a failure. These problems are produced due to failure of properly following the project phases not only the project phases but also there were some of mistakes made while they were working on the project which ended up into the incompletion of the project. To make the project succeed I would like to consider the following steps:

Represent the project to the LGU if they would want the project to be complete. There are some possibilities that the LGU wouldn’t want to continue on the project or they would just find another contractor which will work on the project. Though, representing to them about the project knowing that it is already started and has only a halfway to go until it is finished then the LGU would think on accepting the offer. This would also lessen the work for the team unless the LGU would want to completely rebuild the project. Also, there should be a statement on which the team should be able to submit the complete and working software wherein all the declared problems provided by the LGU is already provided with a solution.

If ever the representation of the project has been accepted by the LGU then I will proceed unto the next action I will need to imply. There would be a restart on the project or it will need recreation and definitely a complete cooperation of the team that will be working on the project. Proceeding unto the following steps:

Recreate the team or regroup the team so that the software development can proceed as planned. This would also make the team to become anew and there will be a whole lot of looking forward to the new team. The team should still comprise of a System analyst, thee Developers/Programmers and also a Project manager, completely capable of monitoring and guiding the team. The newly created team will either work on the incomplete project or create a new project. That decision will also be discussed with the LGU and it will depend on what they want to continue the old project or develop a new project.

Set milestones in accordance with the project. Setting up milestones can make the overall process manageable. In a way, break down the project into different kinds or various goals which has to be accomplished along the making of the project. Dividing the project before proceeding unto the project process will help the team set up goals that can be accomplished in a productive manner. Set a number of task that is required to achieve the projects overall goal. This will also help the team working on bits of the project and can be able to timely work on little tasks that has to be done. It will also help the team so that they can work on ease and they will not be rushed.

Restart on the initiating phase where the failure has started and work on the right processes so that the software development can proceed at ease. By reviewing on the initiating phase the problems from the past team can be somewhat avoided or whatever complications the past team has encountered the new team can be prepared. They will need a whole lot of new planning to do so that everything can be noted though there are times that there are problems that randomly pop-up, the team will be ready.

Reinstitute the planning phase so that the team can redefine the objective and review what course of action to take. It will also help the team gather the right resources and also it will help the team analyze what are the mistakes made by the past team, preparing them what actions to apply if ever such problems arise. Preparing the team a whole lot of new project schedules and activities provided that it is reviewed, and would help attain the objectives and scope that the project would have to undergo.

Have a communication plan so that the LGU will be updated timely about the progress of the project. This will make the LGU consistently posted about the progress of the project. It will also keep the team duly monitored and is under control which will keep the project working. This would also help because continuously communicating with the LGU might be a way in order to know whether the LGU has some request involving the project. The LGU might also have things they would want to change so keeping in contact will make the changes applied a lot earlier.

Have the project manager set schedules which will suit the schedule of the subcontracted team. By doing so, the team can have proper communication and fast update. This will also help the progress of the project because the team has remained intact. There won’t be a problem on the team unless there would be personal problems that would come on their way though having the team intact is already a good step into finishing the project. There are times that the team relies on the project manager so being able to work with the team on accord would help lessen the constraints. Also, having the project manager always present in the phases that the team has come across would mean that he/she can easily provide assistance if needed.

Review the executing phase. In reviewing the executing phase the team can keep track of the probable change that has been or have been made in the project. Also, working on the executing phase will come smooth if everything has gone according to their plan. So, there should be a lot of following up to do in the executing phase especially if there are a great number of changes that has to be applied in the project. Also, being able to follow whatever is changed in the executing phase would help because if ever there were bugs or if somewhere in the project there have been problems the team can easily spot it and execute the right actions.

Fix BETA which has been repeatedly undergoing for testing and has been unprogressive in months. By working on these leftover work it will be a lot faster than before because there will only be fixing needed and not recreating unless it isn’t really working. In fixing the BETA the software can be able to at least work and can continue unto user acceptance testing. By fixing the BETA this would also mean that the LGU can use it and can proceed unto the instruction phase where they will have to teach the users how the software works.

Reset software so it will be user friendly. In resetting the software the team should be able to comply on the need of the LGU which requires the software to be user friendly. Since, not everyone is knowledgeable about such software then this problem should be one of the things that have to be observed. By doing the resetting of the software it will also be a progress as to meet the terms of the LGU which requires it having to be user friendly. Through resetting the problem involving its user interface will be solved and the team can move on to the other complications.

Monitor user acceptance testing. Keeping track on the user acceptance testing will help the team take note on the progress of the software. It will also be useful to the project because the team will be able to refurbish bugs and in doing so the team can work on the changes that has to be made.

Finish modules that have bugs and other modules that are unavailable for testing. By finishing the debugging of the previous bugs found on the other modules the team can precede to the next task. Proceeding unto the other modules that are still unavailable for testing should be done duly on schedule so that if there will be changes that should be applied then it will be easily done.

Continuously monitor and control whatever progress made within the project. Keep track or monitor the progress of the project, by then the team can also provide a proof of improvement to the LGU. This would also show the LGU that there are developments in the project since it has been started. Also, by keeping control unto the project any changes made can be easily accomplished which will also help lessen the consuming of time. If ever there are changes that have to be done it can be easily located by the team because they have monitored every move they have made. This will also make debugging a whole lot lighter since they are keeping track of their every action involving the project.

Formalize the closing of the project. The closing process will definitely show the end of the project, product or the service made by the team. By having the closing process it would also show that every activities that involved the project should be erased or terminated because that would show that the project has been made or done. This process group would also signify that the project is already finished whether it has met the client expectations or not. It would also mean that the contract is done unless the project resulted to fail, then that can be another story. However, if the team has finished the project then it also means that the project management in that company is effective and successful. Their process group was good enough to show finished and satisfying results.

Following these steps will really help the project development though everything resides on the people working on it. It will need their determination and the will to finish the project. Cooperation should always be present so that the team can work on the project productively. Working as a group and doing their best to be able to finish the project is definitely essential since they are a subcontracted group. Professionalism should always be in the front line and that the team should keep it in mind given that they are the third party of the group. Being productive is one of the main goals of the team. Also, being able to finish the project within schedule and it being complete, satisfying the LGU would be excellent. There should always be a product to show to be able to meet the expectation of the contractor and so that they can produce satisfying results which will prove that the team has worked on it with refined effort.

If ever the LGU didn’t accept the offer then that would mean that the project would remain incomplete and would remain on the testing phase without any progress. The project might either end up continuing its testing or it might end up closed depending on the decision of the LGU. Though, the fact that the project was already started and was only left hanging the LGU might as well think of finishing it considering its circumstances. Since, the LGU has thought of having this project and has already installed the other equipment there is a great possibility for the LGU to accept the preceding option.



Post a Comment



+
project management

Shay here!...
Well I'm... 20. Senior?. University of Southeastern Philippines. BS in Information Technology.
I ♥ Sweets!. Marshmallows. Cakes. Ice Creams. Donuts. Chocolates.

When I'm Bored? I... Read. Eat. Sleep. Surf the Internet. Watch Movies.
Play Online Games.
«
»